Wednesday, February 16, 2011

0970 Lagom House - Design Prints for new northside Lagom House are ready

Today, on the occasion of the official introduction of a (sort of) new house plan design - the northside version of our Lagom House - I thought it would be worthwhile to review the design in its entirety to make clear how this relates to the Lagom House we've been looking at for the past year.


This new version of the Lagom House features the same smart plan layout. At just under 1500sf, and with 2.5 baths and 3 bedrooms, it delivers an open living/dining room with separate but connected kitchen, a small home office area, and a homework area for the kids. It is a very family friendly yet very compact home. This is a house that is small enough to be a first home, a "starter" home if we can still use that term in today's world, but lives large enough for a family of four.

read on for the complete history of this house design

Continue reading "0970 Lagom House - Design Prints for new northside Lagom House are ready"

Monday, February 14, 2011

Motrad House - house shell all framed up

The framing of the shell of the house is now done. There is a little bit more of partition framing going on inside, but soon the Electricians, Plumbers, and HVAC men will be on the job installing the guts of the house. Finish work to follow.

I'm very pleased with the how the house is coming out. The progress photos line up very nicely with the design sketches which is very gratifying. And best of all its shaping up to be one very cool house!

And after the link we have a photo browser with more pictures - enjoy!

Continue reading "Motrad House - house shell all framed up"

Wednesday, February 09, 2011

0970 Lagom House - northside version underway

If you recall any of the details of the 0970 Lagom House that was entered in a green house design contest last year, you may remember that there were to be multiple versions. The initial version posted to the catalog was configured to be on the south side of a street, with the roof facing south for solar exposure. Soon we will also have design prints available for the north side configuration.


The south side version faces the sloping roof towards the back yard, while the north side version faces the sloping roof towards the street.


Once this second versions design prints are ready we will move on to prepping the Construction Prints for this efficient house design. This will be the first plan set to be documented to use our New American Wall system for high energy performance.

Continue reading "0970 Lagom House - northside version underway"

Monday, February 07, 2011

MoTrad House - snow does not let up

And neither do the carpenters. The roof is way along now, the front more so than the back, but we can see the massing of the house now. Its no longer overshadowed by its neighbor.


And after the link we have a photo browser with more photos.

Continue reading "MoTrad House - snow does not let up"

Sunday, January 30, 2011

MoTrad House - rafters landing

As the rafters begin to go in you can start to get a sense of the massing of the house.

If you take a look at the project page at our web site you'll see more illustrations of how the house will finally appear. This may help you make sense out of what the rafters are doing here.

Continue reading "MoTrad House - rafters landing"

Tuesday, January 25, 2011

MoTrad House - second floor cometh

The second floor partitions, and the roof in as much as it is tied together with the partitions, have begun to be framed up. Very soon the overall massing of the house will take shape. Already you can start to get a sense of the second floor spaces.


So click through to see the most recent photos from the second floor.

Continue reading "MoTrad House - second floor cometh"

Tuesday, January 18, 2011

MoTrad House - second floor platform done

Not big news, but what this means is that since the second floor platform is in place you can now get a good sense of what the rooms on the ground floor feel like. Some new interior shots and a comparison to the design sketches.


So click through to see more of the main spaces from the ground floor shot from different angles. And I'm going to try to post a short video clip of the ground floor that the owner posted.

Continue reading "MoTrad House - second floor platform done"

Friday, January 14, 2011

USA New Wall - a proposal for a high performance commodity wall system

We've been kicking this idea around for about a year, ever since we created our 0970 Lagom House for a design contest. Inspired by our study of Swedish construction we wanted to create a high performance wall for the US market that lent itself to panel fabrication, and was accessible to any builder using the skills and experience they already have.


Why not use new materials and techniques? How can you make a New Wall that everybody is going to know how to build? We want to create a wall that can be widely adopted, something that any builder can start building tomorrow without any new training, without finding any new suppliers, with out changing the way they run their business. If we want the greatest number of builders to build more efficient houses we need a wall they understand immediately, we need a wall that they can purchase materials for from their existing suppliers, use their existing sub-contractors, and a wall that is familiar enough for them to reliably price and schedule. New materials and new techniques throw off all of this and become barriers to adoption. We don't want barriers. We want everybody to start building more efficient houses. Continue reading for a detailed explanation of this simple but robust wall.

Continue reading "USA New Wall - a proposal for a high performance commodity wall system"

Tuesday, January 11, 2011

MoTrad House - damn the snow, keep on framing

Snow over the weekend, and more coming today, has not slowed the pace of framing at the MoTrad House. The main level of the second floor platform is on and decked, and I suppose we can expect the master bedroom level to follow shortly.

I expected this project to move along more slowly than usual as the owner is doing GC duty himself. But I've been wrong at the framer is moving at a good clip, and the excavation and foundation work was well coordinated and happened quickly as well.

More photos if you click through to read the rest.

Continue reading "MoTrad House - damn the snow, keep on framing"

Saturday, January 08, 2011

MoTrad House - framing up

A quick transition to framing, and the walls are now rising quickly.


The height of the walls here gives us a little clue about the relative ceiling heights. The rear portion of the house at the kitchen and living room enjoy an extra hight ceiling due to the master suite being a few steps up from the rest of the second floor. Stay tuned for more as the carpenters always seem to make short work of the framing. You'll find a photo-browser with more images after the link.

Continue reading "MoTrad House - framing up"

Friday, January 07, 2011

Letters from Sweden - The path lies in revising our roles

Scott, my partner is studying Swedish housing, posted a comment at the Green Building Advisor blog post on my look at Swedish walls. His comment was very thought provoking, so much so I thought it important to repost it here. It is all about how the roles required to build houses in Sweden are different than they are here. As such the expectations are different, and coming to grip with that will probably be more important than any of the hammers and nails involved in changing what we do. In the end buying a house in Sweden is more like buying a kitchen in the US.

I think that any benefits from the Swedish methods are going to be because guys like the ones reading this figure out how to make all this both profitable and beneficial to their lives - because it is good for customers, profits, and their own sense of enjoyment of work. There are some important cultural and trade practice issues. James mentions "replacing skilled labor" by the idea of ordering his walls ...

I wanted to comment about how I saw this kind of factory based building impact the lives of the people who build houses in Sweden, as far as I could tell from my time there.

The Swedes had managed to change the supply chain in light residential construction and consequently they changed the nature of the work involved in building a house.

The closest way I can describe it is to compare it to the work of cabinet installers in the USA. The builders in Sweden come to the job with the same level of "kit" to build a house that we would take to install a kitchen. It is not that cabinet installers in the USA are unskilled - they just need different skills than framers.

Continue reading "Letters from Sweden - The path lies in revising our roles"

Friday, December 31, 2010

Letters from Sweden - A closer look at the Swedish wall

Today we're going to take a closer look at common wall construction in these Swedish factory houses we've been studying. The Swedes build their energy efficient homes using fairly ordinary materials that are not very different than what we use in the US. Ultimately we would like to propose a analogous wall system composed of materials widely available in the US - an American version of the Swedish wall. But first we have to look closer at what they are building.

Several of our earlier posts in the Letters from Sweden series touched on this. Most recently we looked at an automated assembly line, and through observing the assembly process we could see the various layers of the wall. Now we'll look closely at each layer using examples from a few factory web sites. Some Swedish factories market themselves as being green and some offer passive house options straight from the factory. What we will look at here is what I've found in my research to be very typical of Swedish house construction. A baseline if you wish of what the average wall in a Swedish house looks like.

Continue reading "Letters from Sweden - A closer look at the Swedish wall"

Monday, December 27, 2010

MoTrad House - finishing up under foot

Everything that needs to happen below the ground floor is finishing up this week while we all enjoy the holidays. Posts and beams to support the existing ground floor, and what will come above are now in place, and they are preparing to waterproof the foundation so the earth can be backfilled.

There are a bunch of new photos of the nuts and bolts of this work in the extended post below. If such things interest you then by all means click on through.

Continue reading "MoTrad House - finishing up under foot"

Wednesday, December 22, 2010

Texas Plat House - Owners still working that house!

A nice surprise today in my email was a group of photos from the Owners of the Texas Plat House near Austin. They've been busy putting the finishing touches on their house and wanted to share!


Outside the deck has been sealed, and has taken on a deeper wood color. Inside they have tiled their backsplash with some great looking horizontal bar like tiles.


More photos of the finished kitchen and the rest of the work can be seen in the Texas Plat House flickr set. Remember - they are in the woodworking business, and built this kitchen themselves. Hook up with them for your project!

Continue reading "Texas Plat House - Owners still working that house!"