Motrad House - house shell all framed up
categories:
0966 Motrad House,
0967 XHouse3,
construction issues,
modern house plans
The framing of the shell of the house is now done. There is a little bit more of partition framing going on inside, but soon the Electricians, Plumbers, and HVAC men will be on the job installing the guts of the house. Finish work to follow.
I'm very pleased with the how the house is coming out. The progress photos line up very nicely with the design sketches which is very gratifying. And best of all its shaping up to be one very cool house!
And after the link we have a photo browser with more pictures - enjoy!
Get the flash player here: http://www.adobe.com/flashplayer
Why the ledge off the back of the master bathroom?
ReplyDeleteNot a ledge, but a small roof. Its just part of treating this rear corner as differently as we could from the roof in the front.
ReplyDelete