Friday, November 28, 2008

3030 House - framing complete, windows in

The light framing was completed since our last post, and the window units were installed.


There appear to be a few windows that have not been installed yet, but the bulk of them are in place. The siding panels will follow next in the EcoSteel construction sequence.

Make sure to visit the 3030 House flickr group to see all of the photos of this project.

2 comments:

  1. I just got down there this weekend to see it myself and I'll have some more photos to show as soon as I get around to taking them off my camera, uploading, etc..

    ReplyDelete